East Texas Renewables

The Greenwood Farms (City of Tyler) Landfill in Tyler, Texas is home to a high BTU LFG modified physical solvent plant, constructed by Morrow .

The Greenwood Farms (City of Tyler) Landfill in Tyler, Texas is home to a high BTU LFG modified physical solvent plant, constructed by Morrow Renewables in 2009. The plant is designed to treat 3.6 MMSCFD of raw landfill gas, with an initial flow rate of 1.5 MMSCFD (1050 scfm). Morrow Renewables retrofitted the existing perimeter system into a complete gathering system by adding headers and approximately 85 wells. Morrow Renewables also installed a CNG refueling station onsite in 2010. Morrow Renewables is voluntarily minimizing the negative impacts of greenhouse
gases at this non-NSPS site.

  • Turkey Creek Renewables
    Morrow Renewables has recently started operation of its’ most recent landfill gas to energy (high BTU) project south of Ft. Worth, Texas at the Turkey Creek Landfill.
  • Fort Smith Renewables
    Morrow Renewables designed, manufactured and constructed a highBTU LFG modified physical solvent plant for the City of Fort Smith Landfill in May 2005.