Fort Smith Renewables

Morrow Renewables designed, manufactured and constructed a highBTU LFG modified physical solvent plant for the City of Fort Smith Landfill in May 2005.

Morrow Renewables designed, manufactured and constructed a highBTU LFG modified physical solvent plant for the City of Fort Smith Landfill in May 2005, and has since operated the project with a runtime efficiency over 98 percent. The Fort Smith plant was initially designed to handle 3.6 MMSCFD, and with simple modifications will be able to treat much more LFG as the landfill grows. The Fort Smith facility is currently treatingapproximately 2.6 MMSCFD (1800 scfm) of landfill gas, with growth expected over the 70-year life of the project.

  • Turkey Creek Renewables
    Morrow Renewables has recently started operation of its’ most recent landfill gas to energy (high BTU) project south of Ft. Worth, Texas at the Turkey Creek Landfill.
  • East Texas Renewables
    The Greenwood Farms (City of Tyler) Landfill in Tyler, Texas is home to a high BTU LFG modified physical solvent plant, constructed by Morrow .